search for




 

https://doi.org/10.3938/NPSM.70.397
Erratum: Model for Calculating the Cost of an the Electrical Power System for a Carbon-Free Jeju Island
New Phys.: Sae Mulli 2020; 70: 397~397
Published online April 29, 2020;  https://doi.org/10.3938/NPSM.70.397
© 2020 New Physics: Sae Mulli.

Ankhzaya BAATARBILEG, Gae Myoung LEE*

Department of Electrical Engineering, Jeju National University, Jeju 63243, Korea
Correspondence to: myounglk@jejunu.ac.kr
cc This is an open-access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/3.0/) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
Abstract
논문제목 ‘Model for Calculating the Cost of an the Electrical Power System for a Carbon-Free Jeju Island’ 에서
‘Model for Calculating the Cost of the Electrical Power System for a Carbon-Free Jeju Island’로 수정합니다.


May 2020, 70 (5)
  • Scopus
  • CrossMark